Conference Proceedings
Tenth Australian Tunnelling Conference
Conference Proceedings
Tenth Australian Tunnelling Conference
The Race to Finish - From Design to Completion - 5 Km of Three Lane Road Tunnel in Three Years
he Melbourne City Link project will complete a missing link between two existing major freeways in the Melbourne road network, providing a much needed bypass of the Central Business District for through traffic._x000D_
The project, which is being financed under a BOOT arrangement with the Victorian State Government, involves the upgrading of significant stretches of existing freeway and the construction of new sections involving viaducts and tunnels._x000D_
The tunnel sections, which are the focus of this paper, are beneath residential and business areas, the Yarra River, the Royal Botanic Gardens and significant sporting facilities where surface construction would be either impossible or unacceptable (reference Figure 1). The shorter, 1.62 km west bound Domain tunnel comprises two cut and cover sections through Olympic Park then the Yarra River, the driven section of 0.68 km length and exits through a common cut and cover section with the east bound tunnel under St Kilda Road and Sturt Street. The longer 3.76 km east bound tunnel commences at the common portal, through cut and cover under St Kilda Road then 2.86 km of driven section before exiting at a cut and cover section at Burnley. The longer Burnley tunnel has an access and ventilation shaft at approximately its mid point.
The project, which is being financed under a BOOT arrangement with the Victorian State Government, involves the upgrading of significant stretches of existing freeway and the construction of new sections involving viaducts and tunnels._x000D_
The tunnel sections, which are the focus of this paper, are beneath residential and business areas, the Yarra River, the Royal Botanic Gardens and significant sporting facilities where surface construction would be either impossible or unacceptable (reference Figure 1). The shorter, 1.62 km west bound Domain tunnel comprises two cut and cover sections through Olympic Park then the Yarra River, the driven section of 0.68 km length and exits through a common cut and cover section with the east bound tunnel under St Kilda Road and Sturt Street. The longer 3.76 km east bound tunnel commences at the common portal, through cut and cover under St Kilda Road then 2.86 km of driven section before exiting at a cut and cover section at Burnley. The longer Burnley tunnel has an access and ventilation shaft at approximately its mid point.
Contributor(s):
E Taylor, G Munro
-
The Race to Finish - From Design to Completion - 5 Km of Three Lane Road Tunnel in Three YearsPDFThis product is exclusive to Digital library subscription
-
The Race to Finish - From Design to Completion - 5 Km of Three Lane Road Tunnel in Three YearsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1999
- PDF Size: 0.313 Mb.
- Unique ID: P199901002