Conference Proceedings
Tenth Australian Tunnelling Conference
Conference Proceedings
Tenth Australian Tunnelling Conference
The Soft Ground Bored Tunnel Under Sydney Airport
The New Southern Railway (NSR) involves the excavation of approximately 10 km of single bore tunnel from Tempe Reserve, Tempe, to Prince Alfred Park (PAP). PAP is located just south of Central Railway Station in Sydney's Central Business District (CBD). From Tempe Reserve the alignment takes the tunnel under Sydney Airport including the main north/south runway. Sydney Airport is approximately 8 km south of the CBD._x000D_
The NSR is being constructed by a private group, the Transfield Bouygues Joint Venture (TBJV). Transfield is a major Australian contractor and the French contractor, Bouygues, is providing the soft ground tunnel construction expertise and is also responsible for the design of the concrete segmental lining._x000D_
This paper sets out to present in some detail the issues involved in tunnelling under the airport and in particular under the north apron, the main north/south runway and the new elevated roadway. The paper concentrates on these three areas on the airport with an emphasis on the following. The risks involved and measures taken to minimise the risks in tunnelling under the International Terminal north apron (with Jumbo Jets parked immediately above). Secondly, settlement predictions, settlement and runway operation criteria and the actual settlements that have occurred on the main north/south runway. Finally, the criteria that was developed during the construction of the deep bored piers for the elevated roadway at the Domestic Terminal as the TBM passed through this area of construction activity.
The NSR is being constructed by a private group, the Transfield Bouygues Joint Venture (TBJV). Transfield is a major Australian contractor and the French contractor, Bouygues, is providing the soft ground tunnel construction expertise and is also responsible for the design of the concrete segmental lining._x000D_
This paper sets out to present in some detail the issues involved in tunnelling under the airport and in particular under the north apron, the main north/south runway and the new elevated roadway. The paper concentrates on these three areas on the airport with an emphasis on the following. The risks involved and measures taken to minimise the risks in tunnelling under the International Terminal north apron (with Jumbo Jets parked immediately above). Secondly, settlement predictions, settlement and runway operation criteria and the actual settlements that have occurred on the main north/south runway. Finally, the criteria that was developed during the construction of the deep bored piers for the elevated roadway at the Domestic Terminal as the TBM passed through this area of construction activity.
Contributor(s):
E J Nye
-
The Soft Ground Bored Tunnel Under Sydney AirportPDFThis product is exclusive to Digital library subscription
-
The Soft Ground Bored Tunnel Under Sydney AirportPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1999
- PDF Size: 1.639 Mb.
- Unique ID: P199901008