Skip to main content
Conference Proceedings

Tenth Mill Operators' Conference 2009

Conference Proceedings

Tenth Mill Operators' Conference 2009

PDF Add to cart

An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part A - Crushing and Grinding

The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and has increased production from the original 119 t/h design capacity to a milling throughput of 265 t/h in 2008. This was achieved incrementally over several years, by maximising operating efficiencies, in order to minimise capital expenditure, and take advantages of economies of scale; but more importantly it was reached with no measurable loss of recovery. Osborne currently processes a blend of underground and open pit material from the nearby Trekelano deposit. Following primary/secondary crushing, the material is processed through a rod/ball mill grinding circuit ahead of rougher/scavenger flotation that produces a copper concentrate._x000D_
Osborne was seeking a further increase in plant throughput of the order of 15 per cent, but at more sustainable levels of secondary crusher plant utilisation._x000D_
In early 2008, Osborne contracted Metso Process Technology and Innovation (PTI) to review the entire process from run-of-mine feed to final copper concentrate._x000D_
This review would be done concurrently with surveys of both the crushing/grinding and flotation circuits being performed at the same time. The outcome would be a steady-state model of the complete flow sheet allowing the crushing/grinding model to interact with the flotation circuit model, such that overall process optimisation was possible. This was to apply both by exploring the operating limits of the currently installed plant, as well as looking at the logical next stage of capital plant expansions._x000D_
Surveys of the crushing and grinding circuits were conducted at the Osborne concentrator in May 2008. The main objective of the surveys was to review the potential of increasing grinding throughput whilst maintaining the flotation feed 80 per cent passing size. This would also require improving the efficiency of the crushing circuit which was already operating in excess of 80 per cent of the time. Steady-state simulations were performed using the developed circuit models to identify opportunities to increase throughput and alleviate high circulating loads in both the secondary crushing and grinding circuits._x000D_
Due to operational changes, the recommendations resulting from this project were considered by Osborne but have as yet only been partially implemented._x000D_
This paper covers part A or the crushing and grinding component of the project. A separate paper discussing part B or flotation is also being presented at this conference. The results of interactive simulations between the flotation and grinding circuit models are included in part B of this paper.
Return to parent product
  • An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part A - Crushing and Grinding
    PDF
    This product is exclusive to Digital library subscription
  • An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part A - Crushing and Grinding
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2008
  • PDF Size: 4.637 Mb.
  • Unique ID: P200911017

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.