Angas Zinc Mine - Start-Up and the First Twelve Months of Operation in the Adelaide Hills
Terramin Australia Limited's Angas Lead and Zinc Mine operates in the unique and picturesque environment of Adelaide Hills, 60 km South East of the Adelaide city centre itself. The mine was granted approval for construction by the South Australian Government in April 2007 and the Process Plant was constructed and commissioned in July 2008._x000D_
This paper outlines the background to the plant design and the approval process given the close proximity to the local town of Strathalbyn, with a major focus on the commissioning learnings from the Concentrator startup for future reference and a review of the operational performance of the Concentrator throughout the first year of successful production versus design and expectations.
This paper outlines the background to the plant design and the approval process given the close proximity to the local town of Strathalbyn, with a major focus on the commissioning learnings from the Concentrator startup for future reference and a review of the operational performance of the Concentrator throughout the first year of successful production versus design and expectations.
Contributor(s):
M Weidenbach
-
Angas Zinc Mine - Start-Up and the First Twelve Months of Operation in the Adelaide HillsPDFThis product is exclusive to Digital library subscription
-
Angas Zinc Mine - Start-Up and the First Twelve Months of Operation in the Adelaide HillsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2009
- PDF Size: 31.709 Mb.
- Unique ID: P200911015