Commissioning and Optimisation of the Phu Kham Copper-Gold Concentrator
Phu Bia Mining Ltd, a subsidiary of Pan Australian Resources Ltd owns and operates the Phu Kham copper concentrator located in the Xaysomboun District, Lao People's Democratic Republic. Construction and commissioning of the 12 Mt/a copper concentrator and associated facilities was undertaken by Ausenco Ltd and handed over to Phu Bia Mining Ltd in April, 2008. The first copper concentrate was produced in April 2008 and the ship carrying the first shipment of copper concentrate set sail 27 July 2008. Nameplate mill throughput was reached in August, 2008 when 1 020 000 dmt of ore was treated in the milling and flotation circuit._x000D_
The Cu-Au mineralisation is contained in skarn and stockwork mineralisation and is interpreted as a distal expression of a conventional porphyry copper-gold system. Copper mineralisation is principally in the form of chalcopyrite with lesser bornite. Gold occurs as small grains, typically associated with copper minerals. In the upper portions of the orebody, oxidation and water table movements have resulted in near surface leaching of the copper and below the leached zone, supergene enrichment resulted in chalcocite mineralisation._x000D_
The circuit operates with a semi-autogenous grinding (SAG) - ball mill circuit, feeding a bank of OK200 rougher cells. Rougher concentrate is reground in an IsaMill prior to entering a cleaner circuit consisting of three stages of cleaning and one stage of cleaner scavenging._x000D_
The concentrate typically assaying 24 per cent Cu and 6 - 7 g/t Au is hauled for over 1000 km across the border to the Port of Sriracha in Thailand, and stocked in sheds at the wharf from which it is shipped to various Asian smelters._x000D_
This paper discusses the successful commissioning and ramp up to design tonnage and metallurgical performance. In addition, a program to optimise both the comminution and flotation circuit is detailed with reference to grinding efficiency, flotation residence time and size by size mineral recovery.
The Cu-Au mineralisation is contained in skarn and stockwork mineralisation and is interpreted as a distal expression of a conventional porphyry copper-gold system. Copper mineralisation is principally in the form of chalcopyrite with lesser bornite. Gold occurs as small grains, typically associated with copper minerals. In the upper portions of the orebody, oxidation and water table movements have resulted in near surface leaching of the copper and below the leached zone, supergene enrichment resulted in chalcocite mineralisation._x000D_
The circuit operates with a semi-autogenous grinding (SAG) - ball mill circuit, feeding a bank of OK200 rougher cells. Rougher concentrate is reground in an IsaMill prior to entering a cleaner circuit consisting of three stages of cleaning and one stage of cleaner scavenging._x000D_
The concentrate typically assaying 24 per cent Cu and 6 - 7 g/t Au is hauled for over 1000 km across the border to the Port of Sriracha in Thailand, and stocked in sheds at the wharf from which it is shipped to various Asian smelters._x000D_
This paper discusses the successful commissioning and ramp up to design tonnage and metallurgical performance. In addition, a program to optimise both the comminution and flotation circuit is detailed with reference to grinding efficiency, flotation residence time and size by size mineral recovery.
Contributor(s):
I Crnkovic, T Georgiev, G Harbort, M Phillips
-
Commissioning and Optimisation of the Phu Kham Copper-Gold ConcentratorPDFThis product is exclusive to Digital library subscription
-
Commissioning and Optimisation of the Phu Kham Copper-Gold ConcentratorPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2009
- PDF Size: 1.307 Mb.
- Unique ID: P200911012