Conference Proceedings
Tenth Mill Operators' Conference 2009
Conference Proceedings
Tenth Mill Operators' Conference 2009
Operational Results from the Vane Feedwell - Cutting-Edge Modelling Turned into Reality
The complexity of understanding the whole thickening process to achieve real performance improvements cannot be underestimated. The last significant change in feedwell design was more than 15 years ago with the introduction of self-dilution systems - firstly with Outotec's Autodil, followed by FLSmidth's E-Duc._x000D_
Now, following many years of extensive in-house research, including close collaboration with AMIRA and the CSIRO, Outotec has launched the next generation Vane Feedwell. The Vane Feedwell has been globally patented and installed at various sites. This paper briefly outlines the feedwell's development using CFD modelling and its subsequent performance in a real life' site installation._x000D_
Plant results of the first commercial Vane Feedwell, in a mineral sands application, are discussed. The Vane Feedwell was retrofitted so comparative data of pre- and post-installation is shown.
Now, following many years of extensive in-house research, including close collaboration with AMIRA and the CSIRO, Outotec has launched the next generation Vane Feedwell. The Vane Feedwell has been globally patented and installed at various sites. This paper briefly outlines the feedwell's development using CFD modelling and its subsequent performance in a real life' site installation._x000D_
Plant results of the first commercial Vane Feedwell, in a mineral sands application, are discussed. The Vane Feedwell was retrofitted so comparative data of pre- and post-installation is shown.
Contributor(s):
C Loan, G Showers, R Triglavcanin
-
Operational Results from the Vane Feedwell - Cutting-Edge Modelling Turned into RealityPDFThis product is exclusive to Digital library subscription
-
Operational Results from the Vane Feedwell - Cutting-Edge Modelling Turned into RealityPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2009
- PDF Size: 3.669 Mb.
- Unique ID: P200911030