What Can Go Wrong in Comminution Circuit Design?
The design of semi-autogenous grinding (SAG) mill based comminution circuits for the treatment of competent ores, similar to those at Geita and Boddington, involves the same process of sample selection, test work, data analysis and data modelling/interpretation as that used for 'average' competency ores. However, over the past couple of years a number of issues have arisen that are common to the design of circuits for the comminution of 'highly' competent ores. The impact of these issues on project viability is generally more pronounced when treating hard ores than average to soft ores due to the greater impact on capital and operating costs._x000D_
The issues encountered have included: standard test procedures have been modified; test equipment has worn or been damaged; different procedures yield different data and varying interpretation; and modelling and empirical calculations have been based on poor benchmarks, or used incorrectly in the case of JKSimMet, yielding misleading outcomes._x000D_
The purpose of this paper is to present, discuss and clarify some of the issues associated with conducting test work and designing comminution circuits for the treatment of 'highly' competent ores in order to reduce thelevel of conflict arising from interpretation and application of test work data._x000D_
Specifically, the issues associated with the bond crushing (impact) and rod work indices measurement, the various SAG mill specific energy tests, and the interpretation of the resulting data will be discussed in the context of case studies.
The issues encountered have included: standard test procedures have been modified; test equipment has worn or been damaged; different procedures yield different data and varying interpretation; and modelling and empirical calculations have been based on poor benchmarks, or used incorrectly in the case of JKSimMet, yielding misleading outcomes._x000D_
The purpose of this paper is to present, discuss and clarify some of the issues associated with conducting test work and designing comminution circuits for the treatment of 'highly' competent ores in order to reduce thelevel of conflict arising from interpretation and application of test work data._x000D_
Specifically, the issues associated with the bond crushing (impact) and rod work indices measurement, the various SAG mill specific energy tests, and the interpretation of the resulting data will be discussed in the context of case studies.
Contributor(s):
C Bailey, G Lane, S Morrell, P Staples
-
What Can Go Wrong in Comminution Circuit Design?PDFThis product is exclusive to Digital library subscription
-
What Can Go Wrong in Comminution Circuit Design?PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2009
- PDF Size: 0.201 Mb.
- Unique ID: P200911016