Analysis and Management of Loads on Paste Backfill Barricades

Over the past ten years, the mining industry has witnessed the introduction of a new and innovative mine filling technique known as paste fill, which consists of placing full stream tailings with small amounts of binder and water into underground stopes. Paste fill has benefits over traditional backfill methods, such as higher solids contents than hydraulic fill and easier transportation than rock fill. From a geotechnical perspective, the behaviour of very fine material in a fully saturated state can be complex, particularly when binder is added. Previously, there has been no rigorous solution to understanding the paste fill deposition process, resulting in uncertainty regarding critical aspects such as barricade load calculations. This uncertainty has the obvious consequences of potential barricade failures (including at least 12 over the past four years), and for many operations attempts to deal with this uncertainty has led to excessively conservative filling schedules, restricting production._x000D_
This paper presents an application of Minefill-2D, the first rigorous model capable of representing the paste fill deposition process. The model couples the processes of material accretion, consolidation and cement hydration to calculate the distribution of stress around a stope (including the total stress applied to barricade structures) during filling. Minefill-2D is a finite element numerical program, which has been verified using laboratory element tests, centrifuge tests and in situ measurements (Helinski, 2008)._x000D_
The authors present a sensitivity analysis, carried out using the model, to demonstrate some of the critical and less critical aspects relating to paste backfill deposition. The results of this sensitivity analysis are used to devise a fill management strategy that can be utilised to minimise the risk of barricade failures and maximise fill rates where appropriate._x000D_
FORMAL CITATION:Helinski, M, Fourie, A B and Fahey, M, 2008. Analysis and management of loads on paste backfill barricades, in Proceedings Tenth Underground Operators' Conference 2008, pp 15-22 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Analysis and Management of Loads on Paste Backfill Barricades
    PDF
    This product is exclusive to Digital library subscription
  • Analysis and Management of Loads on Paste Backfill Barricades
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2008
  • PDF Size: 0.117 Mb.
  • Unique ID: P200802002

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.