Conference Proceedings
Tenth Underground Operators' Conference 2008
Conference Proceedings
Tenth Underground Operators' Conference 2008
Going Deeper - Has Your Mine Plan Fully Considered Ventilation?
The Kanowna Belle gold mine in Western Australia has reached a depth of 1000 m on the way to 1300 m. A feasibility study undertaken in 2006 identified the mining of E-Block as both technically and commercially feasible. One of the major risks identified in the study was the ventilation capacity, as the existing primary ventilation system would not support the production schedule for mining and a major system upgrade would be required. Failure to provide the necessary airflow would put the project at risk._x000D_
A review of the airflow requirements and infrastructure options detailed in the feasibility study was undertaken to ensure that the assumptions and design were optimised. This review recommended a minimum airflow of 206 m3/s, but by acknowledging the necessary constraints imposed by mining at depth and re-engineering the mine layout to optimise the primary ventilation circuit, this requirement was reduced to 160 m3/s. This represents a 22 per cent reduction in airflow and a reduction in capital cost that will see mining at depth become economically feasible at Kanowna Belle._x000D_
This paper discusses the processes that led to a redesign of the mining layout and highlights the importance of including the ventilation network in the optimisation process._x000D_
FORMAL CITATION:D'Angelo, D and Gardner, P, 2008. Going deeper - has your mine plan fully considered ventilation? in Proceedings Tenth Underground Operators' Conference 2008, pp 109-114 (The Australasian Institute of Mining and Metallurgy: Melbourne).
A review of the airflow requirements and infrastructure options detailed in the feasibility study was undertaken to ensure that the assumptions and design were optimised. This review recommended a minimum airflow of 206 m3/s, but by acknowledging the necessary constraints imposed by mining at depth and re-engineering the mine layout to optimise the primary ventilation circuit, this requirement was reduced to 160 m3/s. This represents a 22 per cent reduction in airflow and a reduction in capital cost that will see mining at depth become economically feasible at Kanowna Belle._x000D_
This paper discusses the processes that led to a redesign of the mining layout and highlights the importance of including the ventilation network in the optimisation process._x000D_
FORMAL CITATION:D'Angelo, D and Gardner, P, 2008. Going deeper - has your mine plan fully considered ventilation? in Proceedings Tenth Underground Operators' Conference 2008, pp 109-114 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
D D'Angelo, P Gardner
-
Going Deeper - Has Your Mine Plan Fully Considered Ventilation?PDFThis product is exclusive to Digital library subscription
-
Going Deeper - Has Your Mine Plan Fully Considered Ventilation?PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2008
- Unique ID: P200802014