Skip to main content
Conference Proceedings

The AusIMM Proceedings 1914

Conference Proceedings

The AusIMM Proceedings 1914

PDF Add to cart

The electrical installation at the state coal mine, Wonthaggi, Victoria

THE coal seams in the State mine area occur in localities scattered over a stretch of country approximately 41 miles long by 3 miles broad, as will be seen from an inspection of Plate I. at the end of this paper. Plate II shows existing transmission lines and those proposed in the near future. These natural conditions made it necessary for any central electrical plant designed to supply power for coal-mining operations to be of a fairly high potential: for economical distribution. The problem of designing such a -central plant was started towards the latter part of 1910, and a three-phase 5000 volt generation and distribution voltage was decided on. This voltage is quite satisfactory up to 6 or 7 miles transmission, and presents no out-of-the-way difficulties of operation. Specifications were prepared on the lines laid out, and tenders closed in December, 1910. The plant was completed in June, 1912.
Return to parent product
  • The electrical installation at the state coal mine, Wonthaggi, Victoria
    PDF
    This product is exclusive to Digital library subscription
  • The electrical installation at the state coal mine, Wonthaggi, Victoria
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1913
  • PDF Size: 2.321 Mb.
  • Unique ID: P_PROC1914_1991

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.