Skip to main content
Conference Proceedings

The AusIMM Proceedings 1940

Conference Proceedings

The AusIMM Proceedings 1940

PDF Add to cart

Changehouses and Equipment at North Broken Hill Limited

The scheme of rehabilitation of surface plant commenced in 1936, included the provision of improved and more hygienic changing and bathing facilities for the employees.At that time the Thompson's Shaft section of the British Mine was being prepared for a resumption of operations, and it was decided to repair and re-equip the existing building. Thus any new scheme adopted could be given a thorough trial, and the proved arrangement used as a basis for the contemplated new main changehouse on the North Section.Investigations were carried out to determine the most suitable arrangement for the Thompson's Shaft changehouse, to provide for a total of 120 men, with particular regard to the internal fittings and fixtures. Also, as the mining conditions were such that a large proportion of clothes worn underground by miners, etc., were wet by the end of the shift, the problem of drying these clothes in the availaole time from a man coming off shift to his commencing again some sixteen hours later was one of the most important to be dealt with.The changehouses in use on the North mine section of the lease were provided with racks around the walls for the men to hang their street clothes on, and a section was partitioned off to house the mine clothes and their drying facilities. The actual drying was carried out by means of hanging the wet clothes over racks between which ran pipe coils heated by means of hot water circulated from the hot water boiler supplying the showers.This method had proved to be far from satisfactory for several reasons, the main objections being:-
Return to parent product
  • Changehouses and Equipment at North Broken Hill Limited
    PDF
    This product is exclusive to Digital library subscription
  • Changehouses and Equipment at North Broken Hill Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1939
  • PDF Size: 0.641 Mb.
  • Unique ID: P_PROC1940_0491

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.