Conference Proceedings
The AusIMM Proceedings 1940
Conference Proceedings
The AusIMM Proceedings 1940
Shaft Plumbing at Mount Isa
In the plumbing of vertical shafts the methods employed and equipment used, are generally made to best suit existing conditions. Undoubtedly, there is no method that can be called standard or that can be used with equal ease and success on all shafts. At the Mount Isa Mines Limited property in Northern Queensland, Australia, local conditions have presented no major difficulties to be overcome in shaft plumbing work. In fact, compared to those at many shafts, the problem has been rather simple. There are three vertical shafts connecting main mine workings, with the greatest plumbing depth for any single lift, 350 ft.Other conditions pertaining to plumbing work have been generally normal.The method we have employed is, in principle, similar to the Weisbach orientation method with a variation that does not necessitate damping of the wires to bring them to rest. Although conditions encountered have not been such that damping the wires would have been inconvenient, we feel we have saved much time and eliminated unnecessary...
Contributor(s):
R Wood
-
Shaft Plumbing at Mount IsaPDFThis product is exclusive to Digital library subscription
-
Shaft Plumbing at Mount IsaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1939
- PDF Size: 0.272 Mb.
- Unique ID: P_PROC1940_0500