Skip to main content
Conference Proceedings

The AusIMM Proceedings 1940

Conference Proceedings

The AusIMM Proceedings 1940

PDF Add to cart

Signalling Equipment for Shaft Hoisting at North Broken Hill Limited

The mmmg operations carried out by North Broken Hill Limited, necessitate the use of four shafts for the haulage of ore, men, and supplies. These are:-1. Blackwood's Shaft.-British Section, which has 100 feet intervals between levels to the bottom 800 feet level plat;2. Thompson's Shaft.-British Section, which has 100 feet intervals between levels to the bottom 1400 feet level plat;3. No. 1 Shaft.-With intervals between levels:(a) 100 feet to the 800 feet level,(b) 150 feet from 800 feet level to the 1700 feet level;4. No. {2 Shaft.-2770 feet from collar to bottom plat, with intervals between levels: (a) 100 feet to 800 feet level, (b) 150 feet from 800 feet level to the 2600 feet level. (c) 170 feet from 2600 feet level to the 2770 feet level.All shafts have two cage compartments, and the No. 2 Shaft a skip installation in addition.For the control of hoisting operations an electric signalling system is installed on each shaft, and is supplemented by a counterbalanced rope pull ("Knocker line") operating a surface gong. The latter system is shown diagrammatically in Fig. 1.Two sets of electrical equipment are used per shaft. The first, shown in Fig. 2, is that operated by the braceman or...
Return to parent product
  • Signalling Equipment for Shaft Hoisting at North Broken Hill Limited
    PDF
    This product is exclusive to Digital library subscription
  • Signalling Equipment for Shaft Hoisting at North Broken Hill Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1939
  • PDF Size: 0.218 Mb.
  • Unique ID: P_PROC1940_0502

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.