Conference Proceedings
The AusIMM Proceedings 1948
Conference Proceedings
The AusIMM Proceedings 1948
Treatment Methods and Plant of Gold Mines of Kalgoorlie Ltd.
The treatment plant of the Gold Mines of Kalgoorlie Ltd. is situated on the Oroya South Lease, on the Eastern edge of the Kalgoorlie Golden Mile.It was designed and erected by Messrs. Alex. Stewart and Company, in consultation with Mr. Harry Hey, and was completed in November, 1937.Its original capacity was 9,000 tons of all-sulphide ore per calendar month, l?ut the plant was extended in October, 1939, to treat 13,000 to 14,000 tons per month of mixed sulphide and oxidised ore.Recovery of the gold is accomplished by cyanide treatment, followed by flotation of the cyanided residue, roasting and cyanidation of flotation concentrate and precipitation of the gold from the cyanide solutions. In the cyanide section, the crushed ore is finely ground in cyanide ,solution and the pulp is agitated to dissolve further gold. It is then thickened and filtered. In the flotation section, this filter residue is conditioned with S02 gas and a pyrite-gold concentrate recovered by flotation.This concentrate is roasted and then cyanided.KALGOORLIE ORE DEPOSIT.The Kalgoorlie ore deposit occurs within a wide area of Pre-Cambrian rocks, ,and consists essentially of two series of basic igneous rocks known as the older greenstone series (calc schist) and the younger greenstone series (quartzdolerite- greenstone) . The older greenstone is a group of lava flows. The younger intrusive greenstone series can, in the main, be classified as a chloritised and carbonated...
Contributor(s):
E K Penrose
-
Treatment Methods and Plant of Gold Mines of Kalgoorlie Ltd.PDFThis product is exclusive to Digital library subscription
-
Treatment Methods and Plant of Gold Mines of Kalgoorlie Ltd.PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1947
- PDF Size: 0.925 Mb.
- Unique ID: P_PROC1948_0643