Conference Proceedings
The AusIMM Proceedings 1953
Conference Proceedings
The AusIMM Proceedings 1953
Notes on the Delayed Method of Stope Filling at Mount Isa Mines Limited
Introduction.History of Stope Filling at Mount Isa.The Need for a Systematic Fill Programme.Reasons for Filling.Fill Materials and Tonnages.Rough Mullock Fill.Quantities Readily Available.Fill Pass Development.Stope Preparation.Drainage.Hydraulic Sand Fill.Initial Experiments with Mill Tailings.Surface Layout.Operation Procedure.Underground Pipe Lines.Life of Sand Pipes and Cones.Drainage.Old Tailings Dam Sands.Quantity of Fill Placed.Pillar Tonnages.Conclusion and Acknowledgment.INTRODUCTIONFilling practice outlined in this paper refers exclusively to the Black Star section of the mine. The stope filling necessary early in the life of the Black Rock and portions of the Rio Grande sections is not to be confused with the current filling programme.
Contributor(s):
G J Burton
-
Notes on the Delayed Method of Stope Filling at Mount Isa Mines LimitedPDFThis product is exclusive to Digital library subscription
-
Notes on the Delayed Method of Stope Filling at Mount Isa Mines LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1952
- PDF Size: 1.237 Mb.
- Unique ID: P_PROC1953_0748