Skip to main content
Conference Proceedings

The AusIMM Proceedings 1953

Conference Proceedings

The AusIMM Proceedings 1953

PDF Add to cart

Supergene Ore at the Girofla Mine Mungana

The Mungana group of mines, in the Chillagoe district, yielded 334,000 tons of ore giving 31,831 tons of lead, 7,907 tons of copper and 3,228,600 ounces of silver. The Girofla mine produced approximately 220,000 tons of ore, and with the Lady J ane mine supplied most of the ore from this centre. The deposit was discovered in 1888, but active development did not commence from the main shaft until 1898. A subsidiary of the New Chillagoe Railway and Mining Co. Ltd., the Mungana (Chillagoe) Mining Co. Ltd., worked the mine from 1902 until 1914, selling copper, copper-lead, lead ores and fluxes to the smelters at Chillagoe. The smelters stopped operations in 1914 when the richer ores of the Girofla had been worked out and production from the Lady Jane had ceased due to heavyground and fire. The Girofla shaft was 823ft. deep with a cross-cut at 810ft. At the 710ft. level contour drives had delineated the orebody, which had been stoped about 10ft. above the level. Except for flux ores which had been stoped only for favourable smelter tariffs, the orebody was practically exhausted above the 610ft. leveL Under company ownership the mine yielded 139,265 tons of an average grade of 4.QlYr copper, 16.2% lead and 12.5 oz. per ton silver.In 1921 the Queensland Government re-opened the mine and worked it until 1927. The North Lode (Fig. 2) was discovered almost immediately at the 100ft. level and was worked down to the 410ft. leveL The ore from this branch and the completion of the stope at the 710ft. level yielded about 80,000 tons of ore averaging 0.4 copper, 9.8 lead and 7.8 oz. per ton silver during this period.
Return to parent product
  • Supergene Ore at the Girofla Mine Mungana
    PDF
    This product is exclusive to Digital library subscription
  • Supergene Ore at the Girofla Mine Mungana
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1952
  • PDF Size: 0.284 Mb.
  • Unique ID: P_PROC1953_0753

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.