Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

The AusIMM Proceedings 1956

Conference Proceedings

The AusIMM Proceedings 1956

PDF Add to cart

The Application of Work Study to Mining Operations at North Broken Hill Limited

Timestudy analysis of mining operations at North Broken Hill Limited has been carried out by dissecting operations into small elemental components, and accurately timing these elements. Over a wide range of observations, this has enabled standard time values to be calculated for all underground work.The application of the standard values is in calculating performances as a measure of work output and Performance Controls are kept on approximately two-thirds of underground employees. Through the Controls it has been possible to stimulate supervisory action to improve low performance, and to reduce delays and lost time.The values are used to calculate contract" prices, and anomalies in previous prices have been adjusted on work values and not on arbitrary standards. In out-of-the-ordinary circumstances, the request for a timestudy investigation has been made by both operatives and foremen, and the contract set following the timestudy analysis has been to the satisfaction of both parties.The range of values enables contracts to be applied to work which was previously performed on a day basis, resulting in improved performance.A natural corollary of timestudy is the analysis of methods, and in some cases method improvements have been introduced.It is anticipated that further investigations will be made on methods.INTRODUCTIONIn 1953, a Timestudy analysis of mining operations at North Broken Hill Limited was commenced under the guidance of management consultants. Its aim was, to determine standard time values for specific operations, which would provide management with a measure of productivity beyond the existing measures of tons or feet of advance, and also to determine whether increased output was available under existing operating conditions.
Return to parent product
  • The Application of Work Study to Mining Operations at North Broken Hill Limited
    PDF
    This product is exclusive to Digital library subscription
  • The Application of Work Study to Mining Operations at North Broken Hill Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1955
  • PDF Size: 0.187 Mb.
  • Unique ID: P_PROC1956_0809

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.