The Design and Operation of a New Ventilation System at the Zinc Corporation Limited and New Broken Hill Consolidated Limited

In 1948, it became clear that the ventilation system of The Zinc Corporation Limited and New Broken Hill Consolidated Limited mines, would be inadequate for future operations. The,paper describes in detail the process of designing an entirely new ventilation system for a large underground mining operation. The system was based on a single new upcast airway to be located on the boundary of the two properties, which were to be ventilated in parallel as two separate ventilating districts.From calculations of resistance, and assessments of future air requirements, the duties of a new exhaust fan to be located on the collar of the upcast airway were specified as 700,000 cubic feet per minute at 26 in. w.g. total pressure for initial operation in 1953 increasing to a maximum of 900,000 c.f.m. at 36 in. w:g. total pressure ten years later. The economic size of the new airway was calculated from a consideration of the first thirty years operation of the system, and it was decided to provide a 20 ft. diameter concrete-lined shaft.The new system went into operation five years after the initial planning, and the effect of the difference between actual and predicted rates and distribution or production are discussed. The final result was entirely satisfactory.INTRODUCTIONThe first proposal for an investigation of The Zinc Corporation Limited-New Broken Hill Consolidated Limited ventilation system with a view to putting it on a proper technical basis was made in 1938. A new Main Shaft was then being sunk, and it was decided to postpone the enquiry until this had been completed to No. 14 Level, when operations would be temporarily suspended and the shaft commence to operate as a major airway. The investigation was completed early in 1940, when Z.C. Ltd. upcast fan was...
Return to parent product
  • The Design and Operation of a New Ventilation System at the Zinc Corporation Limited and New Broken Hill Consolidated Limited
    PDF
    This product is exclusive to Digital library subscription
  • The Design and Operation of a New Ventilation System at the Zinc Corporation Limited and New Broken Hill Consolidated Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1955
  • PDF Size: 1.015 Mb.
  • Unique ID: P_PROC1956_0812

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.