Conference Proceedings
The AusIMM Proceedings 1961
Conference Proceedings
The AusIMM Proceedings 1961
Developments in Ore Handling Methods at Mount Isa Mines Limited
Ore handling improvements at Mount Isa Mines Limited were necessary to keep abreast of technological advances in all phases of sublevel stoping practice.In the early 1930s an efficient ore handling system was in operation.However in 1936 excessive water encountered in deepening the hoisting shaft necessitated the sinking of a second hoisting shaft. Financial difficulties prevented abandoning the original shaft and surface ore handling and crushing facilities, so ore was transferred underground and underground crushing deferred. It was not until 1951 Jhat multilevel crushing permitted increased efficiency in the handling of ore from stopes. Ore was then hoisted in one shaft and transferred on the surface by conveyor belt to a new crushing plant.In 1956 a planned production increase from 5,000 to 11,000 tons per mining day made possible further improvements in ore handling. Larger equipment was installed and existing equipment modified to capacitate the handling of larger sized ore at increased daily tonnages.INTRODUCTIONThe intensive exploratory programme commenced in 1954 disclosed large reserves of both lead and copper ores and in 1956 an expansion programme was initiated to increase production from 5,000 to 11,000 tons per mining day. The increased tonnage would result in decreased costs per ton and further cost reductions would result from increased mechanisation underground. The combined effect would permit larger tonnages of lower grade ores to be included in ore reserves. To achieve both cost reduction and the scheduled production increase, improvement in ore handling was of vital importance.For efficient and low cost sublevel stoping it is necessary to maintain an economic balance between...
Contributor(s):
L D Thomson, C G Palmer, P G Rowe
-
Developments in Ore Handling Methods at Mount Isa Mines LimitedPDFThis product is exclusive to Digital library subscription
-
Developments in Ore Handling Methods at Mount Isa Mines LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1960
- PDF Size: 2.584 Mb.
- Unique ID: P_PROC1961_0927