Conference Proceedings
The AusIMM Proceedings 1961
Conference Proceedings
The AusIMM Proceedings 1961
Some Technical Aspects of Treatment Operations at Mary Kathleen Uranium Ltd.
Major operating aspects of the Mary Kathleen Uranium Ltd. treatment plant are discussed with partkular reference to those which are peculiar to this operation.Problems associated with the production of a penalty free uranium oxide product are examined and the methods developed to overcome them are described in detail.INTRODUCTIONMary K,athleen Uranium Ltd. is the largest of the Australian uranium producers. The flow-sheet is based on fine grinding, standard sulphuric acid leach, ion exchange concentration, and magnesia precipitation of the final product, with certain modifications introduced as the result of pilot plant investigations at the South Australian Department of Mines Research Laboratories in Adelaide.The plant commenced operations in June, 1958, attained design tonnlige of 1,120 tons per day in September of that year and has since operated continuously with a throughput in excess of 1,000 tons per day. Pilot plant recommendations generally have been followed, and predicted results have been attained. The only exception has been the silica and rare earth content of the product produced during the early months of operation. Considerable modification of the early resin regeneration techniques resulted in the reduction of the silica content of the product to within specification limits. Research work in the ion exchange section has also resulted in the reduction of the rare earth content of the product to below specification levels. All product now being produced is completely within the agreed specification limits of impurities.
Contributor(s):
J W Harris, J Boag, P Hemingway
-
Some Technical Aspects of Treatment Operations at Mary Kathleen Uranium Ltd.PDFThis product is exclusive to Digital library subscription
-
Some Technical Aspects of Treatment Operations at Mary Kathleen Uranium Ltd.PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1960
- PDF Size: 1.216 Mb.
- Unique ID: P_PROC1961_0949