Skip to main content
Conference Proceedings

The AusIMM Proceedings 1968

Conference Proceedings

The AusIMM Proceedings 1968

PDF Add to cart

Barrow Island Development Drilling-The Application of Experience, Equipment and Techniques to Achieve Maximum Economy

The commercial development of the shallow (2200 ft2 400 ft) Windalia sand reservoir at Barrow Island provided the opportunity to conduct an intensive drilling programme using equipment and techniques designed for optimum performance.During the initial exploratory and reservoir delineation phase, 12 specific Windalia test wells were drilled using drilling equipment with an optimum depth range of 6QOO ft - 8000 ft and a 9 5/8 in by 7 in. casing programme was employed. The average time from commencement of move-in to rig release exclusive of coring for five representative wells was 187 hr during this phase.Development drilling commenced December 1966 with one rig, with the second in operation January 1967.As of January 1 1968, 168 development wells had been completed. The two rigs employed are drive-in units equipped with a telescoping .gelf raising doubles mast.Optimum depth range with 4 1/2 in. drill pipe is 2500-4000 ft. Casing programme is 8 5/8 in. by 5 1/2 in. Efficient performance was achieved immediately. The average time from commencement of move-in to rig release for 15 wells drilled early in the development programme was 99 hr.By application of experience and further modification of techniques, performance was improved to an average time of 72 hr per well for 15 wells recently completed.The major drilling problem on Barrow Island is surface hole drilling due to the very hard surface limestone combined with complete loss of circulation at sea level.In this operation, significant improvements have been effected. During the exploratory phase drilling, 12 1/4 in hole to set 9 5/8 in. casing, average penetration rate was 23 ft/hr. At the commencement of the development programme penetration rate, drilling 10 5/8 in. hole to set 8 5/8 in. casing, was 28 ft/hr for the 15 early wells considered, improving to 55 ft/hr for the 15 recent wells considered.This programme is a team effort and much credit must be given to the enthusiastic co-operation of the two drilling contractors.The current field record is 2 days 4 hr with a 4 1/2 hr move including the drilling of mousehole and rathole.
Return to parent product
  • Barrow Island Development Drilling-The Application of Experience, Equipment and Techniques to Achieve Maximum Economy
    PDF
    This product is exclusive to Digital library subscription
  • Barrow Island Development Drilling-The Application of Experience, Equipment and Techniques to Achieve Maximum Economy
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1967
  • PDF Size: 0.554 Mb.
  • Unique ID: P_PROC1968_1146

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.