Conference Proceedings
The AusIMM Proceedings 1968
Conference Proceedings
The AusIMM Proceedings 1968
Gas Well Testing in the Roma Area
Gas well tests were performed on 17 wells in the Roma area. The procedure used in the test programme incorporates an initial isochronal test followed by what is described as the "two flow drawdown" technique. The second flow of the two flow drawdown test was conducted for sufficient time to allow transient investigation of the surrounding reservoir. This combination of tests allows the evaluation of stabilized production capacity in addition to the determination ,of several important reservoir characteristics.It also provides a qualitative indication of reserves, by reflecting the presence or absence of reservoir boundaries within the drainage area affected during the test.
Contributor(s):
G H Miller
-
Gas Well Testing in the Roma AreaPDFThis product is exclusive to Digital library subscription
-
Gas Well Testing in the Roma AreaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1967
- PDF Size: 1.148 Mb.
- Unique ID: P_PROC1968_1151