Skip to main content
Conference Proceedings

The AusIMM Proceedings 1968

Conference Proceedings

The AusIMM Proceedings 1968

PDF Add to cart

Mount Isa Cut and Fill (MICAF) Stoping

ABSTRACTMechanised cut and fill stoping in the Racecourse orebodies between II and 9 levels was started in 1964.Five stopes are in progress over the two level interval, extracting the full strike length (600-2,000 ft) of each orebody without transverse pillars.Each stope is served by a central 10 ft by 12 ft service intake ventilation raise and an 8 ft by 8 ft return air raise at each end of the stope. Each stope is divided into two sections for drilling. firing. mucking, and fillingto maintain steady production. All equipment is kept in the stope for one level lift stoping. Gardner-Denver 2 boom jumbos are used for uphole drilling and Wagner ST 5 Scooptrams for loading and transport to ore passes located in the footwall of the orebody. A Wagner PTIO is used for materials handling and scaling of the stope backs.Mill tailings, after one stage of cycloning are used to fill the stope, one section at a time. About 80 per cent of the water is removed by decantation while the remainder percolates through hessian-covered pipes and boxes.The ore is passed to 11 level where it is hauled by the 3 ft 6 in. gauge train to the tipple at the shaft area. The ore is crushed underground before hoisting to the surface.A performance of about 100 ton/manshift is achieved by the drilling, blasting, and mucking crews in the stopes.
Return to parent product
  • Mount Isa Cut and Fill (MICAF) Stoping
    PDF
    This product is exclusive to Digital library subscription
  • Mount Isa Cut and Fill (MICAF) Stoping
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1967
  • PDF Size: 3.086 Mb.
  • Unique ID: P_PROC1968_1157

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.