Skip to main content
Conference Proceedings

The AusIMM Proceedings 1968

Conference Proceedings

The AusIMM Proceedings 1968

PDF Add to cart

Some Operational Aspects of Heap Leaching at Rum Jungle

An oxide ore heap (80,000 ton assaying 2 per cent copper) and a sulphide ore heap (300,000 ton assaying 17 per cent copper) are being leached in series in a closed circuit system. The ore is friable and weatherseasily giving severe percolation problems. These were eased by applying liquors at 235 gal/min to trenches 2 ft wide and 6 ft deep along the full length of the heaps.Cementation recovery was improved from 20 per cent to over 80 per cent by regular intermittent agitation of the iron using a back hoe unit.Liquor pH is controlled by acid addition, and iron content is controlled by a bleed-off set according to predictions made from a pH-Eh diagram drawn for the liquor components. These controls, together with acyclic wetting and draining procedure, have raised production from 6 ton/week to 10 tdn/week of 80 per cent copper.
Return to parent product
  • Some Operational Aspects of Heap Leaching at Rum Jungle
    PDF
    This product is exclusive to Digital library subscription
  • Some Operational Aspects of Heap Leaching at Rum Jungle
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1967
  • PDF Size: 0.658 Mb.
  • Unique ID: P_PROC1968_1162

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.