Conference Proceedings
The AusIMM Proceedings 1982
Conference Proceedings
The AusIMM Proceedings 1982
Geostatical Production Grade Estimation in Mount Isa's Copper Orebodies
This paper describes a detailed geostatistical study of producing copper orebodies at Mount Isa Mines Limited in Queensland, Australia. As a result of this work, kriging has been adopted for grade estimation for final stope design at Isa Mine. Extensive variogram and back analysis studies indicate that one relative variogram model can be used to give optimal kriged grade estimates from production sampling throughout the 100 million tonne copper orebody complex. The kriging method replaces a computer technique used at [sa Mine based on inverse distance weighting using parameters chosen from experience.Comparative stope designs based on 10 million tonnes of ore indicate a 16% increase in minable ore tonnage at a grade well above the cut-off, as a result of the geostatistical work.Although this paper is written as a practical description with simple explanations of geostatistical concepts, the theory and use of relative variograms has been expanded. A possible link is suggested between relative variograms and first order kinetics of natural mineral concentration processes.
Contributor(s):
G F Raymond
-
Geostatical Production Grade Estimation in Mount Isa's Copper OrebodiesPDFThis product is exclusive to Digital library subscription
-
Geostatical Production Grade Estimation in Mount Isa's Copper OrebodiesPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1982
- PDF Size: 2.938 Mb.
- Unique ID: P_PROC1982_1548