Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

The Fourth Australasian Ground Control in Mining Conference (AusRock)

Conference Proceedings

The Fourth Australasian Ground Control in Mining Conference (AusRock)

PDF Add to cart

Challenges in determining the capacity of mesh

A ground support system is a combination of individual reinforcement and surface support elements that work together to retain and contain the rock mass. The various elements are subjected to external loads and to interactive loading between individual ground support system components. This paper focuses on the challenges in determining the capacity and behaviour of mesh, recognizing that installed mesh can be subjected to several loading mechanisms. Field observations from underground hard rock mines demonstrate that there are multiple types of damage and modes of failure of mesh. However, these are difficult to reproduce in a laboratory environment. A critical review has shown that existing mesh laboratory testing rigs reproduce very limited loading conditions that may not be representative of underground conditions. This has significant implications in quantifying and extrapolating the performance of mesh to ground conditions. CITATION:Hadjigeorgiou, J and Stacey, T R, 2018. Challenges in determining the capacity of mesh, in
Proceedings The Fourth Australasian Ground Control in Mining Conference (AusRock), pp 280-290 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Challenges in determining the capacity of mesh
    PDF
    This product is exclusive to Digital library subscription
  • Challenges in determining the capacity of mesh
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2018
  • PDF Size: 1.393 Mb.
  • Unique ID: P201805026

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.