Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

The Fourth Australasian Ground Control in Mining Conference (AusRock)

Conference Proceedings

The Fourth Australasian Ground Control in Mining Conference (AusRock)

PDF Add to cart

Investigating the tunnel closure using convergence confinement method and 2D plane strain finite difference analysis

The Convergence Confinement Method (CCM) is one of the frequently used methods that considers the ground response to the advancing tunnel face. The CCM analytical solutions represent stress relaxation on circular tunnel walls in a rock/soil media. The CCM analytical solutions is based on circular tunnel geometry and consider a hydrostatic stress field in a homogeneous isotropic rock mass condition. However, noncircular tunnel geometries, non-hydrostatic stress field, staged excavation process in a discontinuous anisotropic non-linear rock mass conditions are usually ignored in these analytical solutions. In this paper, we investigate the performance of the existing CCM analytical solutions developed for elastic and elastoplastic ground behaviour for circular tunnels. For this purpose, a finite difference analysis is conducted to compare the analytical results with the results obtained from Finite Difference Method (FDM) for a chosen rock mass condition. Results obtained from the investigation shows that floor, crown and wall displacement are 30%, 10% and 23% more, respectively, in a horse-shoe relative to a circular tunnel. This indicates that the application of analytical formulation tailored for circular tunnels would lead to inaccurate quantification of wall convergence in horseshoe-shaped tunnels. CITATION:Kabwe, E, Karakus, M, Chanda, E and Akdag, S, 2018. Investigating the tunnel closure using convergence confinement method and 2D plane strain finite difference analysis, in
Proceedings The Fourth Australasian Ground Control in Mining Conference (AusRock), pp 152-159 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Investigating the tunnel closure using convergence confinement method and 2D plane strain finite difference analysis
    PDF
    This product is exclusive to Digital library subscription
  • Investigating the tunnel closure using convergence confinement method and 2D plane strain finite difference analysis
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2018
  • PDF Size: 0.628 Mb.
  • Unique ID: P201805015

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.