Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

The Fourth Australasian Ground Control in Mining Conference (AusRock)

Conference Proceedings

The Fourth Australasian Ground Control in Mining Conference (AusRock)

PDF Add to cart

Research on supporting technology for production level roadways of block caving in Pulang Copper Mine

Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the successful application of block caving. However, with Tong Kuangyu being the only mine in China which has applied such a method, we currently lack relevant experience in the successful application of the method. This paper has studied the influence of different rock mass zonings, fault thickness, fault dip angles, on-site construction quality on the production level, roadway stability of block caving through numerical simulation and analysed the roadway stability in different kinds of support solutions so as to ensure the successful application of block caving in Pulang Copper Mine. The results have shown that the existing support method in Pulang Copper Mine can meet the requirement of roadway support in zone II and III, but could not satisfy the demand in terms of support strength in the relatively fragmented zone I area. When roadway passes through the fault, the deformation of surrounding rock and plastic zone of roadway will gradually decrease with the increase of fault dip angle; the deformation of surrounding rock and plastic zone of roadway will gradually increase with the increase of fault thickness. An ideal support effect can be achieved through the joint support of grouting and bolting when roadway passes through the fault. In the measured model of on-site construction, there is stress concentration in the intersection between the access and transverse drift of ore removal. Therefore, the stability of the roadway can be improved by improving the construction quality. CITATION:Sun, W, Hou, K, Zhang, X, Feng, X, Liu, H, Zhe, Y and Zhao, B, 2018. Research on supporting technology for production level roadways of block caving in Pulang Copper Mine, in
Proceedings The Fourth Australasian Ground Control in Mining Conference (AusRock), pp 95-106 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Research on supporting technology for production level roadways of block caving in Pulang Copper Mine
    PDF
    This product is exclusive to Digital library subscription
  • Research on supporting technology for production level roadways of block caving in Pulang Copper Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2018
  • PDF Size: 0.75 Mb.
  • Unique ID: P201805010

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.