Skip to main content
Conference Proceedings

The Second AusIMM International Geometallurgy Conference 2013

Conference Proceedings

The Second AusIMM International Geometallurgy Conference 2013

Publication sale now on, get up to 70% off

PDF Add to cart

The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel Project

The Dutwa Nickel Project is a nickel laterite atmospheric leach project located in Tanzania that has been under development by African Eagle Resources plc (2012). A bankable feasibility study (BFS) has been progressed to evaluate mining of the resource (107 Mt at 0.92 per cent Ni) followed by hydrometallurgical processing on-site to make a mixed nickel-cobalt intermediate product. The unique relatively high silica contents in the Dutwa deposits, as opposed to limonite, which is more commonly occurring in nickel laterites, presented the possibility for beneficiation of the ores to enhance the leach feed nickel grades and provide economic benefits in terms of operating and capital cost efficiencies.Geometallurgical relationships, based on the results of an extensive variability metallurgical test work program for beneficiation and leaching, were developed for the BFS, which resulted in an improved understanding of ore classifications within the deposit and their responses. The geometallurgical information obtained has been instrumental in making key preliminary techno-economic decisions, such as forecasting whether or not mined material should be beneficiated and was ultimately used to drive the mine plan towards the prioritisation of areas within the deposits that delivered the best cost efficiencies and overall project economic outcomes.CITATION:Elkington, T, Lorenzen, L and Czerny, C, 2013. The use of geometallurgical relationships in process route selection and mine plan optimisation for the Dutwa Nickel Project, in Proceedings The Second AusIMM International Geometallurgy Conference (GeoMet) 2013 , pp 207-216 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel Project
    PDF
    This product is exclusive to Digital library subscription
  • The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2013
  • PDF Size: 2.438 Mb.
  • Unique ID: P201310026

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.