Skip to main content
Conference Proceedings

The Second International Conference on Prospecting in Arid Terrain, Perth

Conference Proceedings

The Second International Conference on Prospecting in Arid Terrain, Perth

PDF Add to cart

Water Supply Development for the Paddington Gold Project

The Paddington project is a gold mining and processing operation located 35 km north of Kalgoorlie in the Eastern Goldfields region of Western Australia (Figure 1). The project, which is operated by Pancontinental Goldmining Areas Pty Ltd, treats 1.25 Mtpa of oxidised gold ore, derived mainly from open cuts adjacent to the plant, with minor tonnages from other pits in the region treated on a custom-milling basis. Gold is recovered using a conventional CIL process. The process raw water supply of 3 500 kUd is derived from the local groundwater system. Average salinity of the raw water is around 90 000 - 100 000 mg/L total dissolved solids. A small portion of the raw water is passed through a vacuum distillation desalination plant to produce the project's 200 kUd requirement for high quality water for potable use and gold recovery.
Return to parent product
  • Water Supply Development for the Paddington Gold Project
    PDF
    This product is exclusive to Digital library subscription
  • Water Supply Development for the Paddington Gold Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1988
  • PDF Size: 0.469 Mb.
  • Unique ID: P198802038

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.