Conference Proceedings
Third International Mine Water Congress, Melbourne
Conference Proceedings
Third International Mine Water Congress, Melbourne
Hydrogeological Testing in Underground Holes during Grouting
The development of the SECV brown coal open cut at Loy Yang will require depressurisation of aquifers both within and below the coal seam sequence in order to maintain open cut stability. Prediction of future open cut dewatering requirements at Loy Yang Open Cut and evaluation of the regional consequences of dewatering has required development of a detailed hydrogeological model of the Loy Yang area. The complex stratigraphy of the coal seam and aquifer/aquitard sequences at Loy Yang have been analysed and integrated with the hydrogeological concepts developed from regional groundwater studies to formulate a realistic hydrogeological model as a basis for finite-element flow modelling.
Contributor(s):
J N Spichack
-
Hydrogeological Testing in Underground Holes during GroutingPDFThis product is exclusive to Digital library subscription
-
Hydrogeological Testing in Underground Holes during GroutingPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1988
- PDF Size: 0.225 Mb.
- Unique ID: P198809027