Skip to main content
Conference Proceedings

Third International Mine Water Congress, Melbourne

Conference Proceedings

Third International Mine Water Congress, Melbourne

PDF Add to cart

Water Management of the Mae Moh Project

This paper presents the water management plan of the Mae Moh Project in the North of Thailand, which includes a large lignite opencast mine and thermal power plants. Lignite production will increase from the present 5.5 million tons per annum to approximately 20 million tons per annum by 1995 when the pit area will be about 20 sq.km. and the depth at over 300 meters. Seven power plants are proposed of which two are under construction. The total capacity to be installed is 2,925 MW. The principles considered for water management are firstly flood protection, including drainage of the mining pit and diversion of the Mae Moh stream away from proposed future mining areas; and secondly, a plan to meet the water requirement of the thermal power plants, while maintaining downstream supplies for irrigation and other purposes. The limited annual run-off of Mae Moh and Mae Chang watershed basins are inadequate for the proposed power plants. A study has been prepared to compare two approaches, namely conveying water from remote watersheds to meet the water requirement of the power plants up to total installed capacity; or by limiting future total generation, at the existing site, to only 2025 MV.
Return to parent product
  • Water Management of the Mae Moh Project
    PDF
    This product is exclusive to Digital library subscription
  • Water Management of the Mae Moh Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1988
  • PDF Size: 0.244 Mb.
  • Unique ID: P198809089

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.