Design and Implementation of the In-the-Wall Ramp at Marvel Loch South Pit
Marvel Loch South Pit has had a number of stages of open and underground mining activities before acquisition by Sons of Gwalia. The historical pit had achieved a completed pit depth of 150 metres and the shaft and decline mine had reached approximately 220 metres in depth using open stope mining methods. The various mining methods reflect the various economics and industry practice at the time. The South Pit ore zones are medium grade (~2.5 g/t) but have a regular geometry and large tonnes per vertical metre. A number of studies have been completed up to a pre-feasibility stage looking at options to extend the pit depth and to lower the unit cost of gold production. The options considered were the re-optimisation of the pit to determine further cutbacks or the innovative use of an in-the-wall ramp. The in-the-wall ramp (tunnel) would permit the removal of the in pit ramp to expose additional ore that was within the footprint of the ramp design and to provide the opportunity to increase the final pit depth. Similar mining method has only been used at Three Mile (Coolgardie, WA) and Chalice Mine (Norseman, WA). The tunnel would serve as a gateway for further extension of the south mine and the central ore zone via underground mining methods. The ultimate depth of the South Pit has been extended to 310 metres below surface and significant additional ore has been recovered. This paper will give an insight into the various studies to optimise the Tunnel mining method, the determination of the various tunnel dimensions, and the phases of mining to arrive at the completed design.
Contributor(s):
M C Valent, K Williams
-
Design and Implementation of the In-the-Wall Ramp at Marvel Loch South PitPDFThis product is exclusive to Digital library subscription
-
Design and Implementation of the In-the-Wall Ramp at Marvel Loch South PitPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2003
- PDF Size: 0.38 Mb.
- Unique ID: P200301044