Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio story

Didipio gold-copper mine operation is situated in the island of Luzon, approximately 270 km north of Manila in the Philippines, in an area of high seasonal rainfall. The hydrogeological water flow model implied that there would be high connectivity between regional structures and underground operations. This model predicted that underground mine groundwater inflows were expected to quickly rise as the decline progressed to a peak of 510 L/s. Designing a capital pump station to deal with 510 L/s has its own challenges, however developing the decline down to the required level, always dealing with 300 L/s of water and constructing the pump station is extremely challenging and required a robust water management plan and mine design. When dealing with expected high volumes of water, underground mine design and scheduling plays a key role in protecting electrical infrastructure, equipment, secondary pumps, and the decline from flooding. A good drainage system and controlled dewatering plan is essential for safety and progress. This paper details the dewatering techniques and mine designs required to accomplish decline development with high water inflows as used in the Didipio project. It will describe the learnings and outcomes that are achievable with a flexible design, as new structures are mapped, and water intersections are increased. It also highlights the potential for adaptability in mine planning to provide evolving improvements or to evade problems that are expected from the constant reconciliation of data recorded during development.
Return to parent product
  • Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio story
    PDF
    This product is exclusive to Digital library subscription
  • Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio story
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2023
  • Pages: 14
  • PDF Size: 1.394 Mb.
  • Unique ID: P-02998-F9H3P7

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.