The design and implementation of the Kibali gold mine off-shaft development

The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with initial access established through twin surface declines, followed by the commencement of a blind sink 8 m diameter rock hoist shaft in March 2013. Stope production started in December 2014 with ore and waste trucked to surface. The 755 m deep blind shaft sink was completed in August 2015 together with the cutting and equipping of three main station levels. Two of these levels provide access for the establishment of the underground materials handling system as well as the main dewatering system for the mine. This paper covers the process of determining the optimal location of the Kibali hoisting shaft relative to project-specific critical factors, and then focuses on the design and implementation journey associated with the off-shaft development that essentially encompasses the Material Handling System (MHS) for the mine. The journey starts from the findings of the previous owners Feasibility Study (FS), a subsequent Optimised FS, followed by detailed engineering through to implementation. It was identified during implementation that a significant change in the designed off-shaft layout was required following detailed underground geotechnical and hydrogeological investigations. In addition, the paper provides details on the MHS performance since commissioning to steady state, and on key learnings relating to the overall project process.
Return to parent product
  • The design and implementation of the Kibali gold mine off-shaft development
    PDF
    This product is exclusive to Digital library subscription
  • The design and implementation of the Kibali gold mine off-shaft development
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2023
  • Pages: 16
  • PDF Size: 1.814 Mb.
  • Unique ID: P-03017-Y9R8M9

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.