Conference Proceedings
Underground Operators' Conference, Broken Hill
Conference Proceedings
Underground Operators' Conference, Broken Hill
Development And Production Of The 15 To 13 Level Modified Micaf, Mount Isa Mines Limited
The Racecourse Orebodies at Mount Isa consist of a series of parallel steeply dipping lead/zinc/silver orebodies with a strike length of up to 1000 metres. Production from these orebodies between 13 Level to 9 Level has been by a series of cut and fill stopes in two level stages, leaving a crown pillar at 11 level. Development of the 15 level to 13 level extraction stage has recently been completed._x000D_
The layout consists of a series of parallel stopes over a strike length of 1200 metres._x000D_
Access to the stopes is by two declines connecting the stopes with a series of crosscuts This paper describes the basic layout with development and production methods employed.
The layout consists of a series of parallel stopes over a strike length of 1200 metres._x000D_
Access to the stopes is by two declines connecting the stopes with a series of crosscuts This paper describes the basic layout with development and production methods employed.
Contributor(s):
J D Dryver
-
Development And Production Of The 15 To 13 Level Modified Micaf, Mount Isa Mines LimitedPDFThis product is exclusive to Digital library subscription
-
Development And Production Of The 15 To 13 Level Modified Micaf, Mount Isa Mines LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1977
- PDF Size: 0.356 Mb.
- Unique ID: P197703007