The Development Of L44 Ventilation Shaft (Surface To 11 Level), Mount Isa Mine Limited
L44 Shaft is a major upcast ventilation shalt in the hanging wall of the 1100 Orebody._x000D_
Various techniques for stripping a raisebored pilot hole were combined to produce L44 shaft. From the surface to 198 m depth, the shaft was concrete lined 7.3 m internal diameter. Below this the shaft was developed to 7.6 m diameter unlined. 11 level, 540 m below the surface, was the first readily accessible level connection._x000D_
The section to 198 m depth was benched and concrete lined through weak oxidised ground._x000D_
When more competent ground was encountered the operation was converted to horadiam stripping. This application of the raiseborer has led to a safer, more efficient method of shaft development.
Various techniques for stripping a raisebored pilot hole were combined to produce L44 shaft. From the surface to 198 m depth, the shaft was concrete lined 7.3 m internal diameter. Below this the shaft was developed to 7.6 m diameter unlined. 11 level, 540 m below the surface, was the first readily accessible level connection._x000D_
The section to 198 m depth was benched and concrete lined through weak oxidised ground._x000D_
When more competent ground was encountered the operation was converted to horadiam stripping. This application of the raiseborer has led to a safer, more efficient method of shaft development.
Contributor(s):
R G Grills, R E Martin
-
The Development Of L44 Ventilation Shaft (Surface To 11 Level), Mount Isa Mine LimitedPDFThis product is exclusive to Digital library subscription
-
The Development Of L44 Ventilation Shaft (Surface To 11 Level), Mount Isa Mine LimitedPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1977
- PDF Size: 0.384 Mb.
- Unique ID: P197703020