Skip to main content
Conference Proceedings

Underground Operators' Conference, Kalgoorlie, November 1995

Conference Proceedings

Underground Operators' Conference, Kalgoorlie, November 1995

PDF Add to cart

The Development of the Rib-Roc Cable Bolt Reinforcement System at the Pasminco Mining Broken Hill Operations

Longhole stope overbreak has always been a source of unwanted cost
within the underground mining industry, and efforts to control it using
various rock reinforcement systems have long been a rock engineering
challenge. At the Pasminco Mining Broken Hill Operations trials have been
carried out using an innovative cable bolt reinforcement system known as
Rib-Roc. The system, based loosely on the Swedish Rib-in-Roc concept,
utilises zones or ribs of heavily reinforced rock in the troublesome
hangingwall and back areas of longhole stoping. The trials were carried out under a strict qualitative and quantitative
scientific stope measurement program utilising rock mechanics
instrumentation. Not only did the trial demonstrate the success of the
system but data obtained was useful in implementing the system virtually
as standard practice throughout the operation.
Return to parent product
  • The Development of the Rib-Roc Cable Bolt Reinforcement System at the Pasminco Mining Broken Hill Operations
    PDF
    This product is exclusive to Digital library subscription
  • The Development of the Rib-Roc Cable Bolt Reinforcement System at the Pasminco Mining Broken Hill Operations
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1995
  • PDF Size: 1.3 Mb.
  • Unique ID: P199507041

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.