Development in Ground Support Practices at ISA Mine
A programme of testing and evaluation has been in progress at Isa Mine for the last four years with the objectives of rationalising ground support practices, improving installation quality and increasing productivity of ground support functions._x000D_
Numerous innovations have been successfully implemented. These include the introduction of swellex rockbolts as the major form of temporary support, the use of splitset rockbolts as the primary means of support for the hangingwalls of cut and fill stopes and the introduction of dowels with pumped cement for general long term support._x000D_
The installation of swellex bolts has been successfully mechanised throughout the mine using Tamrock automatic rockbolters and Atlas Copco BUK 11R drilling rigs modified for this purpose.
Numerous innovations have been successfully implemented. These include the introduction of swellex rockbolts as the major form of temporary support, the use of splitset rockbolts as the primary means of support for the hangingwalls of cut and fill stopes and the introduction of dowels with pumped cement for general long term support._x000D_
The installation of swellex bolts has been successfully mechanised throughout the mine using Tamrock automatic rockbolters and Atlas Copco BUK 11R drilling rigs modified for this purpose.
Contributor(s):
R L Morland, J Thompson
-
Development in Ground Support Practices at ISA MinePDFThis product is exclusive to Digital library subscription
-
Development in Ground Support Practices at ISA MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1985
- PDF Size: 0.254 Mb.
- Unique ID: P198502010