Skip to main content
Conference Proceedings

Underground Operators' Conference, Kalgoorlie

Conference Proceedings

Underground Operators' Conference, Kalgoorlie

PDF Add to cart

Electrification and use of Electric Hydraulic Equipment at Mount Lyell

In 1972, with the West Lyell Open Pit winding down, mining operations transferred underground. All development tunnelling until the end of the decade was carried out by a fleet of ten pneumatic Jumbos._x000D_
A decision was made in 1980 to purchase an electric-hydraulic Jumbo and a second was purchased in 1982. Their introduction changed the face of development at Mount Lyell._x000D_
Significant new demands were placed on main- tenance sections, particularly on electrical reticulation._x000D_
Subsequently, two further electric- hydraulic Jumbos were purchased from Agnew Mining in 1984, and successfully overhauled and commissioned. As well, two electric- nydraulic production drilling rigs have been purchased. Only one of the original pneumatic Jumbos remains in service.
Return to parent product
  • Electrification and use of Electric Hydraulic Equipment at Mount Lyell
    PDF
    This product is exclusive to Digital library subscription
  • Electrification and use of Electric Hydraulic Equipment at Mount Lyell
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1985
  • PDF Size: 0.581 Mb.
  • Unique ID: P198502011

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.