Skip to main content
Conference Proceedings

Underground Operators' Conference, Kalgoorlie

Conference Proceedings

Underground Operators' Conference, Kalgoorlie

PDF Add to cart

Use of Isanol in Production Blasting at ISA Mine

The Isa Mine of Mount Isa Mines Limited produces 2.6 million tonnes of silver-lead-zinc ore annually from sub level open stopes of which approximately 40% comes from the narrow Racecourse orebodies below 15 level._x000D_
Geologically the stoping environment is complicated by highly fissile shale hangingwalls and below 17 level by a high stress regime._x000D_
The realization that major hangingwall failures and generally poor ground conditions could lead to serious dilution problems, and ultimately production shortfalls, prompted investigations into the use of low strength explosives.
Return to parent product
  • Use of Isanol in Production Blasting at ISA Mine
    PDF
    This product is exclusive to Digital library subscription
  • Use of Isanol in Production Blasting at ISA Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1985
  • PDF Size: 1.016 Mb.
  • Unique ID: P198502030

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.