Conference Proceedings
Underground Operators' Conference, Mount Isa
Conference Proceedings
Underground Operators' Conference, Mount Isa
Construction and Utilisation of the Olympic Dam Service Decline
The mining production rate of two million tonnes per annum at Olympic Dam required greater servicing capacity than was available with the existing Whenan Shaft. To increase servicing capability a Service Decline was constructed from June 1986 to June 1987 extending 2000 m from the surface and linking up with inclining development from the existing Whenan Shaft workings. The decline was used for access of all men and materials during the construction phase of the ore handling system. During production, most mine servicing will be via the decline with hoisting of rock through Whenan Shaft.
Contributor(s):
G C Hall
-
Construction and Utilisation of the Olympic Dam Service DeclinePDFThis product is exclusive to Digital library subscription
-
Construction and Utilisation of the Olympic Dam Service DeclinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1988
- PDF Size: 0.642 Mb.
- Unique ID: P198804002