Construction of A Sewer Pipeline of 1 200 MM Internal Diameter by A Pipe Jacking Method Using A Small Tunnel Boring Machine
This is a brief introduction of a sewer pipeline constructed with a pipe jacking method in combination with a 1 200 mm finished inner diameter tunnel boring machine developed for the first time in Japan. The pipeline is located under a national highway running through a densely built urban area and is 185.7 m long and 2.9 m to 3.7 m deep from the ground surface. The geological features along the pipeline show mostly slate and partly silt. The pipeline was constructed with a newly developed multi-application type tunnel boring machine equiped with a fluid transport system._x000D_
The construction consisted of tunneling by a tunnel boring machine followed by pipe jacking operations. The excavated materials were dis- charged off the tunnel by a fluid transport System.
The construction consisted of tunneling by a tunnel boring machine followed by pipe jacking operations. The excavated materials were dis- charged off the tunnel by a fluid transport System.
Contributor(s):
S Gomi
-
Construction of A Sewer Pipeline of 1 200 MM Internal Diameter by A Pipe Jacking Method Using A Small Tunnel Boring MachinePDFThis product is exclusive to Digital library subscription
-
Construction of A Sewer Pipeline of 1 200 MM Internal Diameter by A Pipe Jacking Method Using A Small Tunnel Boring MachinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1987
- PDF Size: 0.951 Mb.
- Unique ID: P198701008