Japan Construction Method and Machinery Research Institute has been conducting various field surveys of tunnel works and other excavation works, and the cost and efficiency of these two excavation methods have been studied._x000D_
Based on these data, the costs of blasting excavation and mechanical excavation represented by roadheaders were calculated. The costs were calculated and compared for rocks of various hardness. When the total construction cost is considered, the degree of overbreak becomes one of the most influencial factors, because the overbreak area must be filled up with expensive shotcrete in NATM. So, in the next step, the relation between the excavation costs considering overbreak and the rock hardness was studied using the data on overbreak obtained by the field survey.
Based on these data, the costs of blasting excavation and mechanical excavation represented by roadheaders were calculated. The costs were calculated and compared for rocks of various hardness. When the total construction cost is considered, the degree of overbreak becomes one of the most influencial factors, because the overbreak area must be filled up with expensive shotcrete in NATM. So, in the next step, the relation between the excavation costs considering overbreak and the rock hardness was studied using the data on overbreak obtained by the field survey.
Contributor(s):
T Mitani, T Yamamoto, Y Kameoka, K Yokozawa
-
Cost Comparison of Blasting and Mechanical ExcavationPDFThis product is exclusive to Digital library subscription
-
Cost Comparison of Blasting and Mechanical ExcavationPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1987
- PDF Size: 0.529 Mb.
- Unique ID: P198701009