Skip to main content
Conference Proceedings

Vl Australian Tunnelling Conference: Bore or Blast, Melbourne

Conference Proceedings

Vl Australian Tunnelling Conference: Bore or Blast, Melbourne

PDF Add to cart

Pilot Tunnel and Blast Enlargement for Vibration Control

The link between the Lecco bypass and major road SS36 (Italy) requires the construction of a double two-way tunnel (through the mount San Martino carbonatic massif). The tunnel excavating section is about 90 sqm through mount San Martino carbonatic rocks. The mountain sides are unstable and are often the scene of large collapsing landslides (tens of thousand cubic metres). The tunnels are very close to the mountain sides. The use of blasting induces vibrations which may reach the Lecco built-up area. With a view to avoiding such dangers the excavating operations were carried out in two successive stages: - opening a pilot tunnel, whose section is about 10 square metres, by a full face TBM to eliminate the more intense vibrations which are generated by the first opening charges; - successive enlargement by blasting.
Return to parent product
  • Pilot Tunnel and Blast Enlargement for Vibration Control
    PDF
    This product is exclusive to Digital library subscription
  • Pilot Tunnel and Blast Enlargement for Vibration Control
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.645 Mb.
  • Unique ID: P198701038

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.