Conference Proceedings
Vl Australian Tunnelling Conference: Bore or Blast, Melbourne
Conference Proceedings
Vl Australian Tunnelling Conference: Bore or Blast, Melbourne
Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.
A 3050m long section of a 1.65m internal diameter tunnel is presently under construction in the Brisbane area by means of the pipe-jacking method. The soils along the alignment had been deposited in a deltaic/estaurine environment and rapid changes in soil type occur. The tunnel passes beneath several extensive bodies of surface water. Groundwater problems have been experienced with tunnelling through alluvial sands and gravels. Details of the ground conditions, the pipe-jacking method used and tunnelling experience are discussed in this Paper.
Contributor(s):
A S Day, M J Fagan, N R Baczynski
-
Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.PDFThis product is exclusive to Digital library subscription
-
Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1987
- PDF Size: 0.954 Mb.
- Unique ID: P198701039