Conference Proceedings
Vl Australian Tunnelling Conference: Bore or Blast, Melbourne
Conference Proceedings
Vl Australian Tunnelling Conference: Bore or Blast, Melbourne
The Jacobs Sliding Floor: Current Competitive Applications
The Jacobs Sliding Floor (Floor) is experiencing a surprisingly long competitive life. The first Floor was used on the Camino Tunnel in California in 1960. At that time the Robbins Company had built only seven TBMs, and the future for such machines was considered doubtful by many, as compared to drill and blast methods. This was then, and still is, commonly called the "conventional" method. Robbins' TBM No. 8 was for the Hydro Electricity Commission of Tasmania (HEC) for their Poatina Hydro Project in 1961. In this writer's view, the Poatina experience was the start of successful hard rock boring machines. But, by coincidence, the HEC is using the newest Floor for their King River Hydro project, where driving with the Floor started in July 1986 on the King Tunnel. This paper examines the history and developments in both Floor design and other "conventional" tunnelling equipment, and the site specific conditions that have allowed this old concept to still be competitive in certain select situations. Parametric costing data and some actual progress records are included.
Contributor(s):
A M Petrofsky
-
The Jacobs Sliding Floor: Current Competitive ApplicationsPDFThis product is exclusive to Digital library subscription
-
The Jacobs Sliding Floor: Current Competitive ApplicationsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1987
- PDF Size: 0.496 Mb.
- Unique ID: P198701063