Skip to main content
Conference Proceedings

Vl Australian Tunnelling Conference: Bore or Blast, Melbourne

Conference Proceedings

Vl Australian Tunnelling Conference: Bore or Blast, Melbourne

PDF Add to cart

The Jacobs Sliding Floor: Current Competitive Applications

The Jacobs Sliding Floor (Floor) is experiencing a surprisingly long competitive life. The first Floor was used on the Camino Tunnel in California in 1960. At that time the Robbins Company had built only seven TBMs, and the future for such machines was considered doubtful by many, as compared to drill and blast methods. This was then, and still is, commonly called the "conventional" method. Robbins' TBM No. 8 was for the Hydro Electricity Commission of Tasmania (HEC) for their Poatina Hydro Project in 1961. In this writer's view, the Poatina experience was the start of successful hard rock boring machines. But, by coincidence, the HEC is using the newest Floor for their King River Hydro project, where driving with the Floor started in July 1986 on the King Tunnel. This paper examines the history and developments in both Floor design and other "conventional" tunnelling equipment, and the site specific conditions that have allowed this old concept to still be competitive in certain select situations. Parametric costing data and some actual progress records are included.
Return to parent product
  • The Jacobs Sliding Floor: Current Competitive Applications
    PDF
    This product is exclusive to Digital library subscription
  • The Jacobs Sliding Floor: Current Competitive Applications
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.496 Mb.
  • Unique ID: P198701063

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.