Skip to main content
Conference Proceedings

Vl Australian Tunnelling Conference: Bore or Blast, Melbourne

Conference Proceedings

Vl Australian Tunnelling Conference: Bore or Blast, Melbourne

PDF Add to cart

Tunnel Boring Under Stockholm City

Boring of a 7.5Km long tunnel under the city of Stockholm commenced in January, 1987. The 3.5m diameter tunnel will pass under the buildings and as no ground settlement is allowed, the regulation for water leakage into the tunnel is very strict. Probe drilling will be carried out continuously ahead of the boring and when water is encountered the rock has to be grouted before passing with the TBM. The tunnelling system enables probe drilling to be carried out during boring with the TBM. This has earlier been a capacity reducing factor as the whole operation has been stopped during probe drilling. The project is using a new generation TBM especially developed for hard rock formations which require higher thrust per cutter to get a high penetration rate.
Return to parent product
  • Tunnel Boring Under Stockholm City
    PDF
    This product is exclusive to Digital library subscription
  • Tunnel Boring Under Stockholm City
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.476 Mb.
  • Unique ID: P198701068

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.