Skip to main content
Conference Proceedings

Vl Australian Tunnelling Conference: Bore or Blast, Melbourne

Conference Proceedings

Vl Australian Tunnelling Conference: Bore or Blast, Melbourne

PDF Add to cart

Tunnel Construction by TBM Sand Bar Hydroelectric Project

This paper discusses the recently com- pleted TBM-driven pressure tunnel at the Sand Bar Hydroelectric Power Project. The Sand Bar Project is a diversion scheme situated on the middle fork of the Stanislaus River in the Western Sierra Nevada, California, U.S.A. As part of the project, a 5.6 km long and 3.71 m diameter unlined pressure tunnel was bored by a Jarva TBM at the average rate of .37.5 m/ day. This report deals with construction aspects of the tunnel, including TBM performance, lining design, and remedial support measures. Correlations between TBM performance, geologic conditions, and rock properities are made, and the Contractor's mode of operations are discussed. Advance rate prediction, and the impact of these excellent advance rates attainable in hard rock using the new machines are discussed.
Return to parent product
  • Tunnel Construction by TBM Sand Bar Hydroelectric Project
    PDF
    This product is exclusive to Digital library subscription
  • Tunnel Construction by TBM Sand Bar Hydroelectric Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.476 Mb.
  • Unique ID: P198701069

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.