Skip to main content
Conference Proceedings

World Gold 2013

Conference Proceedings

World Gold 2013

PDF Add to cart

A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents a new scheduling algorithm that incorporates with a novel stockpile configuration system, an improved algorithm on multiple processes and a mixed-integer linear programming (MILP) global optimisation model. It can simultaneously optimise stockpiles, blending, multiple processes as well as multiple mines. In addition, it allows the user to interact with the solution to adjust the solution to be practical and desirable.CITATION:Ren, Y, 2013. A simultaneous optimisation tool for open pit mine scheduling, in Proceedings World Gold 2013 , pp 427-432 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • A Simultaneous Optimisation Tool for Open Pit Mine Scheduling
    PDF
    This product is exclusive to Digital library subscription
  • A Simultaneous Optimisation Tool for Open Pit Mine Scheduling
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2013
  • PDF Size: 0.72 Mb.
  • Unique ID: P201309051

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.